Thoroughly aligned along the horizon along two axes. After aligning, the lags are attached to the slabs using dowel. If the lags are not attached, then the possibility is not excluded that the floors will “walk”. Then, chipboard slabs are laid out on the lags and fastened to them with self -tapping screws. About twenty -five or thirty cm through the edge of the plate. In the middle part of the plate, a little less often, after eighty – one hundred cm. A gap should remain between the chipboard and the wall – ten to fifteen millimeters. (Subsequently, it will close the plinth). The gap between the slabs should be minimal, no more than one millimeter. Ideally, it should not be at all. Laying of chipboard slabs should start from the wall, which is further from the entrance.
After you laid the foundations, dared sawdust and removed the garbage, carefully inspect the joints of the plates to each other, we proceed to the final stage of linoleum can be laid down. If there is a need, with the help of a rubbank and sandpaper, remove all the differences.